amtrak downeaster
-
PublishedSeptember 1, 2016
Legislator complains Maine is shortchanging Lewiston-Auburn rail study
The Legislature allocated $500,000 for the study in its 2016 budget, but the Department of Transportation estimates it will cost half that.
-
PublishedAugust 31, 2016
Maine Voices: All should be aboard for Maine-to-Montreal train with stop in Lewiston
As has been proven elsewhere, when quality passenger service is available, people will use it.
-
PublishedAugust 26, 2016
U.S. to loan Amtrak $2.4 billion for Northeast Corridor upgrades
Officials say the loan will allow Amtrak to boost seating by about 40 percent on Acela trains traveling between Washington and Boston, among other improvements.
-
PublishedAugust 22, 2016
Views from Downeaster train’s dome car are top of the line
Passengers get a 360-degree panorama and a whole new perspective on the scenery between Portland and Boston, but the vintage ride is ending Sept. 18.
-
PublishedAugust 17, 2016
Downeaster to boost Brunswick service by building new track
Adding a second set of tracks in the four-mile stretch through Falmouth and Cumberland will make it possible to run five daily round trips between Brunswick and Boston.
-
PublishedAugust 4, 2016
Amtrak’s new locomotives sharply reduce engine-related delays
The new engines, built in California, are mostly used on the heavily traveled Northeast Corridor with 'heartening' results.
-
PublishedJuly 21, 2016
Legislative committee to review Amtrak Downeaster service
Preliminary research hasn't revealed any big problems, but the review will continue.
-
PublishedJune 8, 2016
Amtrak Downeaster extends pet travel policy
A pilot program begun in October becomes permanent.
-
PublishedApril 10, 2016
Letter to the editor: Downeaster service from Portland to Brunswick too costly for light use
There’s a clear difference in thinking between air and rail transportation planners. A 20-year master plan for Portland’s airport (March 9) “expects passenger volume to increase by nearly 40 percent by 2036,” noting that a “greater percentage of those passengers will be carried by larger airplanes” because of the cost-effectiveness of high-capacity vehicles. This is […]
-
PublishedJanuary 11, 2016
Amtrak’s Downeaster chugs into 2016 in timelier fashion
The rail service was clobbered by delays and disruptions that led to a 30 percent on-time performance in the last fiscal year, but in December, 86 percent of Downeaster trains arrived on time.
- ← Previous Page
- 1
- …
- 5
- 6
- 7
- 8
- Next Page →