PORTSMOUTH, N.H. – New Hampshire’s Department of Transportation is continuing its six-month interim inspection at the Sarah Mildred Long Bridge in Portsmouth on Monday, June 6.

The inspection is scheduled to last through Friday, and possibly into Monday, June 13.

This bridge carries U.S. Route 1 Bypass over the Piscataqua River between Portsmouth and Kittery, Maine.

The Long Bridge will have lane closures as needed, and as weather permits, from 8 a.m. to 3:30 p.m. daily for up to six days.

filed under: